Service for machine and plant builders

    Cybersecurity risk assessment under the Machinery Regulation and the CRA – per system type, ready to sign in two weeks.

    The Machinery Regulation and the CRA require a documented cybersecurity risk assessment before CE marking. We produce it per system type in two sessions with the design team. After that, each order only documents the delta.

    Request an intro call

    The assessment is audit-ready for the technical documentation under the Machinery Regulation and the CRA

    It follows the STRIDE methodology that the draft harmonised standard to the Machinery Regulation (prEN 50742) and IEC 62443 recommend for risk assessment. Two sessions with the design team; we handle preparation and follow-up.

    1. 1

      We arrive at the workshop prepared

      First session with engineering on network diagram, components and remote maintenance path. Data flow diagram, zone model and a pre-filled threat register are produced in advance.

    2. 2

      One workshop day on site with the design team

      Method training for the team, confirmation of the architecture assumptions, rating of every threat by likelihood and impact, measures for the high levels.

    3. 3

      After two weeks the design team signs

      Post-processed threat register with risk levels, measures backlog, open points and residual risks, mapped to CRA Annex I and Machinery Regulation Annex III.

    Every threat gets a risk level from likelihood and impact

    We define both scales per product, from 1 (special hardware, physical access, no known exploit) to 5 (trivially exploitable, remote without authentication). Measures start where the level is high. What remains afterwards is recorded as residual risk and accepted by the design team.

    Impact →

    1
    2
    3
    4
    5
    1
    2
    3
    4
    5

    ↓ Likelihood

    Risk level:Very lowLowMediumHighVery high

    The assessment covers Machinery Regulation Annex III and CRA Annex I and stays maintainable per order

    1. System description with data flow diagram and zone model
    2. Prioritised threat register per interface
    3. Measures backlog based on IEC 62443-3-3 and -4-2
    4. Mapping to CRA Annex I and Machinery Regulation Annex III
    5. Residual risks and notes for the instructions for use
    6. Maintenance rule for the per-order delta

    Special-purpose machines also need only one assessment per system type

    Control platform, operator level, remote maintenance and customer network repeat. One assessment covers the same architecture (Guidelines C(2026) 5252, paras 174–176).

    We review an existing template as a gap analysis

    Against Machinery Regulation Annex III, CRA Art. 13 and Annex I, and IEC 62443-4-1. Each gap comes with what has to be added.

    Afterwards the assessment serves as the template for every further project

    The team knows the method from the workshop and maintains the register itself. Only vulnerability management stays ongoing; example in the article.

    Frequently asked questions on cybersecurity risk assessment

    No. It covers malfunction, wear and misuse, not deliberate interference. The existing document remains valid and is supplemented by the threat analysis; it is not replaced.

    No. One base assessment is produced per system type, and a documented delta per order. The Commission's CRA guidelines allow one shared risk assessment for variants with the same architecture and the same risks (C(2026) 5252, paras 174 to 176). The scope follows the control platform and the interfaces.

    None. The CRA and the Machinery Regulation are method-neutral; the Commission's CRA FAQ (v1.4, no. 4.1.2) requires threat modelling that fits the intended purpose of the product. We work with a threat analysis per interface, a grid of likelihood and impact, and IEC 62443 as the reference for measures.

    For the Machinery Regulation, for machinery placed on the market from 20 January 2027. For the CRA, for products placed on the market from 11 December 2027. Anyone delivering in this period introduces the assessment into the running order book.

    A network diagram, the component list (for example from EPLAN), a list of interfaces including the remote maintenance path, and one person from engineering or design who knows the system type. Whatever is missing we capture together in the first session.

    No. The risk assessment is part of the technical documentation. The conformity assessment and the EU declaration of conformity stay with the manufacturer, that is the plant builder who places the installation on the market. We produce the assessment, the design team signs it.

    Request an intro call on the risk assessment.

    30 minutes on system type, interfaces and schedule. We reply by email with proposed dates.