Guide · as of October 2026

    The plant SBOM in five steps.

    A plant SBOM is a device list: manufacturer, order number and firmware version per component. The guide shows how it is created at acceptance and how supplier advisories are matched to your own installations – without waiting for manufacturer SBOMs.

    What the guide answers

    1. 1

      Where the device list comes from when no manufacturer provides an SBOM.

    2. 2

      Which method actually reaches the devices of your control world.

    3. 3

      How supplier advisories can be matched to your own installations without CPE.

    4. 4

      What has to be maintained after delivery so the 24-hour deadline holds.

    Who it is for

    Technical management, engineering and service at machine and plant builders and system integrators that deliver installations with controllers, drives, HMIs and network equipment from several manufacturers.

    Get the guide as a PDF.

    The download starts after submitting. We use name and company to get in touch if there are questions – no newsletter.